| Waiting room new concrete ground floor and floor joists for first floor area all installed. |
![]() |
| Main entrance corridor floor lowered and concrete slab cast. |
![]() |
| First floor flat stripped out ready to start refurbishment. |
![]() |
| The proscenium arch infilled and getting ready to cast the floor slab in the Waiting Room and Main Office. |
![]() |
| Floor level reduced in the corridor to make sure all the ground floor is accessible. |
![]() |
| Some demolition completed and drainage started |
![]() |
| The old stage floor taken out and lowered ... this is where the new main office will be ! |
![]() |
| and here's the Waiting Area ... some imagination needed! |
![]() |
| The corridor level has been reduced to make the whole ground floor level and doorways cut down as well. |
![]() |
| The site is well served by buses in and out of Bristol |
... doors being hung, lots of painting and ramp/steps to main entrance ... Door from main office into Waiting Area Door and screen in...